Fulham Reach Scope of Works
Client name: Axis
Project Value: £10,000,000
Project Type: Mechanical and Electrical Engineering
Architect: Broadway Malyan
Project Manager: St George
Detailed mechanical and electrical design for 21 high-end luxury apartments in Fulham.
Dee Solutions was employed by the mechanical and electrical sub-contractor to undertake the detailed mechanical and electrical design and co-ordinated working drawing from RIBA design framework level 3 to RIBA stage 6.
Carried out under a design and build contract, this luxury residential development consisted 21 high-end apartments and corresponding central plantroom and plant.
To ensure comfort and energy efficiency for these beautiful homes we included UFH heating, AC comfort cooling, lighting, small power, audio visual and home automatic system to control all systems.
The design of the mechanical, electrical and public health systems also included cold water, hot water, waste and foul water, low temperature hot water, heating, VRV cooling, rainwater, lighting, electrical distribution, earthing, metering, communications, BMS, fire systems and natural gas.
- The total CO2 emissions of the residential section was be reduced by 31% over a Building Regulations (2010) baseline. These reductions will be achieved through energy efficiency measures, a CHP engine, PV panels and Air Source Heat Pumps.
- Code for Sustainable Homes Level 3 will be achieved for all dwellings and BREEAM Very Good for the commercial spaces.
- Water efficient devices and rainwater harvesting will reduce internal water consumption; internal potable water usage in dwellings will be less than 105 litres/person/day.
Client testimonial
“Dee Solutions supported us every step of the way. They attended bi-weekly meetings to develop and finalise the design with our client and employers’ agent. They achieved a fully compliant and co-ordinated design and through dimensioned working drawings we were able undertake the project with confidence in their solution.”